Continue ShoppingNote: Delivery Orders: Small Load Deliveries (Less than 6 tons of products sold by the ton, or less than 8 cubic yards if sold by volume), are currently scheduling around 1 week - 1 1/2 weeks in advance. Large Loads 7 - 20 tons or 9 cubic yards - 20 cubic yards are booking about 4-5 days in advance right now. Please plan accordingly. This is only an estimate and not a guarantee.
Asphalt Materials will be closed Saturday 5/28/22 - Monday 5/30/22 in observance of the Memorial Day Holiday.
Rotomill 1/2″ Crushed Asphalt
For delivery, select quantity:
This product must be placed at 2” depth MINIMUM.
Depending on how tightly you compact it, compaction could require up to 20% – 30% more.
These calculators are designed to give approximate amounts only. They will help you determine the quantity you need; however, variations in subgrade, compaction of subgrade, or inaccurate measurements, even a quarter of an inch of depth, can make a difference.
This product must be placed at 2” depth MINIMUM.
Warning: you have entered a thickness that is less than the minimum recommended depth of 2 inches.